Canton, Ohio
Multi-purpose office space for an increased workload
The Stark Area Regional Transit Authority (SARTA) has outgrown their existing office spaces at its main bus facility in Canton, OH, and intends to build a new 14,000 SF addition off of the north side of its existing bus garage. The building is comprised of four main volumes, a glass box signifying the main entrance, a translucent volume which creates the lobby, a masonry façade (the executive area) and a metal panel clad form which makes up the office space.
The new addition will house over 20 private offices, conference rooms, huddle rooms, along with a new kitchen and employee break area. All of these functions will center around a new 2,000 SF multi-purpose room that will be able to house large events. This room can be divided into 3 smaller rooms by means of operable walls. The new addition will be clad in metal panels, a translucent wall system and a brick façade. This new facility will start construction in 2022 and will be completed by early 2024.